eKH

Air and Atmosphere

Search results

  1. Data Report on the Acid Deposition in East Asian Region 2000

    Wet deposition monitoring has been implemented in order to observe concentrations and to evuluate fluxes of acidic sunstances deposited to the land surface and to obtain the equivalent quality of monitoring data, each participating country carried out aci ...

    aman - 10/21/2005 - 15:43

  2. Data Report on the Acid Deposition in East Asian Region 2000

    Automatic monitoring methods and filter pack method were used to carry out the dry deposition (air concentation) monitoring, mainly focused on priority chemical species. Monitoring data were summmed up into monthly average value with maximum, minimum, and ...

    aman - 10/21/2005 - 15:44

  3. Data Report on the Acid Deposition in East Asian Region 2000

    In the Technical Manual for monitoring Soil abd Vegetation (second ISAG, 2000), the objectives have been clarified, and the basic survey was proposed for the initial objectives. According to the Technical Mnaual, the basic survey was basically carried out ...

    aman - 10/21/2005 - 15:45

  4. Data Report on the Acid Deposition in East Asian Region 2000

    Inland aquatic monitoring was put into action to access adverse impatcs on terrestrial and aquatic ecosystem.The cause of pH decline is to be the deposition of acidic substances into lakes in excess amounts of their neutralization or buffering capacity. T ...

    aman - 10/21/2005 - 15:46

  5. The Third Interim Scientific Advisory Group Meeting

    The meeting was attended by members of ISAG, ADB, CSIRO, EMEP and UNE/ECP. There are some mentioned issues which are 1) site classification criteria should be reviewed carefully, 2) the importance of the levels of QA/QC activities was emphasized, 3) revie ...

    aman - 10/19/2005 - 09:51

  6. The Second Interim Scientific Advisory Group Meeting

    This is the First meeting of the Interim Scientific Advisory Group (ISAG) for the Preparatory-Phase Activities of the Acid Deposition Monitoring Network in East Asia (EANET). Issues considered are 1) consideration and adoption of the monitoring guidelines ...

    aman - 10/21/2005 - 16:48

  7. The Third Meeting of the Working Group

    The meeting was held in Yogohama, Japan. There are issues, reported such as results of the ISAG1, status of current activities of the Interim Secretariat and the Interim Network Center, review of activities of the participating countires and the like. Air ...

    aman - 10/21/2005 - 16:50

  8. The Fourth Working Group Meeting

    There are considered issues during the Fourth Working Group (WG), whcih are 1) the outcomes of the ISAG2, 2)consideration of the design of the Network and the document, 3) consideration of the procedure for the designation of the Secretariat and the Netwo ...

    aman - 10/21/2005 - 16:51

  9. Data Reporting Procedures and Formats for Acid Deposition Monitoring in East Asia

    As part of the acid deposition monitoring of various environment, data reporting procedures and formats is made in order to have a consistant data. This includes specific formats on information on national center,national monitoring plan,information of re ...

    aman - 10/21/2005 - 15:49

  10. Enhanced Application of Climate Prediction in Pacific Island Countries Projectf

    This project will assist Pacific Island countries to establish or improve what are their meteorological services by sharing the climate knowledge and forecasting experiences of the Australian Government's Bureau of Meteorology. Climate Change Science ...

    iges_partner - 08/09/2014 - 22:07